SAP ABAP Data Element PIQEDEXT_ENDDA (Valid To Date for Completion of Ext. Academic Achievement)
Hierarchy
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
   IS-HER-CM-AD (Application Component) Administration
     PMIQ (Package) Campus Management
Basic Data
Data Element PIQEDEXT_ENDDA
Short Description Valid To Date for Completion of Ext. Academic Achievement  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 To 
Medium 15 Completion To 
Long 20 Completion To 
Heading 20 Completion To 
Documentation

Definition

Specifies the end date of the period in which an external academic achievement (external academic work or qualification) can be completed.

Use

Dependencies

You maintain the external academic achievements of students on the Ext. Achievements tab page in student master data. When you run equivalency determination, the system checks if the following dates of the external achievements are within the period during which this work was completed (completion period):

  • External qualifications (object type EQ)

    When you maintain an external qualification on the Degree/Qual. tab page, you must enter the (anticipated) completion date in the Date field.

    The completion date must be within the completion period for it to be acknowledged.

  • External subjects (object type SU)

    When you maintain external subjects on the Subjects Taken tab page, you can enter the following time data:

    • Withdrawal
    • Session and year (or only the year)
    • Start date
    • End date

      The system acknowledges an external subject as external academic work only if the following applies:

    • If you enter a date for the external subject, this date must be within the completion period.
    • If you enter a time period for the external subject, this period has to only partially overlap the completion period.

History
Last changed by/on SAP  20050224 
SAP Release Created in 471