SAP ABAP Data Element PCN_CHKER (Insufficient Amount Covered by Employer)
Hierarchy
☛
SAP_HRCCN (Software Component) Sub component SAP_HRCCN of SAP_HR
⤷ PA-PA-CN (Application Component) China
⤷ PB28 (Package) HR master data: China
⤷ PA-PA-CN (Application Component) China
⤷ PB28 (Package) HR master data: China
Basic Data
Data Element | PCN_CHKER |
Short Description | Insufficient Amount Covered by Employer |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | InsuffByER |
Medium | 15 | Insuff Cov ByER |
Long | 20 | Insuff Amt Cov by ER |
Heading | 2 | ER |
Documentation
Definition
Select insuff amt cov by er when the employer must fulfill the requirements for the SIP Provident Fund of the Suzhou Industrial Park. According to these requirements, when the employee's contribution base is lower than the employee's base low limit, the employer is required to cover the difference. The amount to be paid by the employer equals the base difference multiplied by the employee contribution rate.
For example, if the employee's contribution base is CNY 400 , the employee's base low limit is CNY 550, and the employee contribution rate is 6%, the employer should pay the difference, which equals CNY 9.
9= (550-400)*6%
Use
Dependencies
Example
History
Last changed by/on | SAP | 20070912 |
SAP Release Created in |