SAP ABAP Data Element PCN_ACCMT (Accumulation Period in Month)
Hierarchy
SAP_HRCCN (Software Component) Sub component SAP_HRCCN of SAP_HR
   PA-PA-CN (Application Component) China
     PB28 (Package) HR master data: China
Basic Data
Data Element PCN_ACCMT
Short Description Accumulation Period in Month  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM02    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Acc.Month 
Medium 19 Accumulation Period 
Long 28 Accumulation Period in Month 
Heading 28 Accumulation Period in Month 
Documentation

Definition

Specifies the accumulation period for the entitled medical treatment period.

Use

Based on legal requirements, an employee's medical treatment period must be accumulated in a certain period.

You specify the accumulation period for each period of medical treatment to which employees are entitled. When you enter an absence record for an employee in the Absences (2001) infotype, the system checks whether the number of months' sick leave that the employee takes in the accumulation period exceeds the medical treatment period to which the employee is entitled.

The system sets the end date of the accumulation period to the end date of the current absence record, and therefore the start date of the accumulation period is a certain number of months before the end date of the current absence record.

Example

Assume local regulations stipulate that for employees who have worked in your company for less than 5 years, they are entitled to 1 month's sick leave in an accumulation period of three months. If an employee takes sick leave from March 21 to 31, 2009, the accumulation period for the medical treatment period check is from January 1, 2009 to March 31, 2009.

History
Last changed by/on SAP  20110809 
SAP Release Created in