SAP ABAP Data Element PBR_CDIAS (Number of days after settlement)
Hierarchy
☛
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
⤷
PY-BR (Application Component) Brazil
⤷
PC37 (Package) HR settlement: Brazil

⤷

⤷

Basic Data
Data Element | PBR_CDIAS |
Short Description | Number of days after settlement |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC2 | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | No.of days |
Medium | 15 | Number of days |
Long | 20 | Number of days |
Heading | 18 | Number of days |
Documentation
Definition
This field specifies the number of days to be added to the termination date in a way to obtain the date on which the special off-cycle payroll run payment should be carried out.
Use
This field is used if it becomes necessary to process several personnel number with different termination dates. In consequence, each one will have a different date for severity pay.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19991210 |
SAP Release Created in |