SAP ABAP Data Element PBR_CDIAS (Number of days after settlement)
Hierarchy
SAP_HRCBR (Software Component) Sub component SAP_HRCBR of SAP_HR
   PY-BR (Application Component) Brazil
     PC37 (Package) HR settlement: Brazil
Basic Data
Data Element PBR_CDIAS
Short Description Number of days after settlement  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUMC2    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 No.of days 
Medium 15 Number of days 
Long 20 Number of days 
Heading 18 Number of days 
Documentation

Definition

This field specifies the number of days to be added to the termination date in a way to obtain the date on which the special off-cycle payroll run payment should be carried out.

Use

This field is used if it becomes necessary to process several personnel number with different termination dates. In consequence, each one will have a different date for severity pay.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19991210 
SAP Release Created in