SAP ABAP Data Element PAU_MWDAY (Minimum number of working days per week)
Hierarchy
SAP_HRCAU (Software Component) Sub component SAP_HRCAU of SAP_HR
   PY-AU-PS (Application Component) Public Sector
     P13P1 (Package) HR-AU-PS: Master data for Public sector Australia
Basic Data
Data Element PAU_MWDAY
Short Description Minimum number of working days per week  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MWDAY 
Medium 15 MWDAY 
Long 39 Minimum number of working days per week 
Heading 39 Minimum number of working days per week 
Documentation

Definition

Specifies the number of days the employee has to work at least per week.

Procedure

Enter the minimum number of working days per week.

If you specify this field together with the Minimum number of hours per week field, it means that the employee has to work the minimum number of hours and the minimum number of days per week. If you specify either one of these fields, the employee only has to fulfil this one condition.

Examples

You specify the

  • Minimum number of hours per week = 25 hours
  • Minimum number of days per week = 4 days

The interpretation of this example is that the employee has to work at least 25 hours per week and 4 days per week. If you specify either one of the above, it means that the employee has to work 25 hours per week or 4 days per week.

Dependencies

History
Last changed by/on SAP  20010720 
SAP Release Created in