SAP ABAP Data Element PABGKZ (Delimit start/end time for attendance/absence reasons)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷
PT (Application Component) Personnel Time Management
⤷
PTIM (Package) HR Time Management Application Development
⤷
⤷
Basic Data
| Data Element | PABGKZ |
| Short Description | Delimit start/end time for attendance/absence reasons |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ABGKZ | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Delimit |
| Medium | 15 | Delimit |
| Long | 20 | Delimit start/end |
| Heading | 5 | Del. |
Documentation
Definition
If a reason for an attendance/absence of less than one workday is recorded along with the first or last time event of the day, the start/end time must be determined for the resulting attendance or absence pair. The following delimitation indicators are used:
C = Core working times from daily work schedule
N = Normal working times from daily work schedule
P = Planned working times from daily work schedule
If no delimitation indicator is set, delimitation must be controlled during rule processing in time evaluation.
History
| Last changed by/on | SAP | 19950401 |
| SAP Release Created in |