SAP ABAP Data Element P_99L_SEL_DATE (Selection date for reporting results)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PY-XX-RS (Application Component) Reuse Services for Country Development
     P99L (Package) Payroll Latin America
Basic Data
Data Element P_99L_SEL_DATE
Short Description Selection date for reporting results  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type P99L_SEL_DATE    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 SelDate 
Medium 15 Selection Date 
Long 20 Selection Date 
Heading 14 Selection Date 
Documentation

Definition

This date determines for which month the payroll result is going to be taken into account.

Use

This parameter has 3 possible values:

  • B:Begin date of the for-period
  • E:End date of the for-period
  • P:Payroll pay date

The default value is 'B'. This means that the begin date of the for-period is used to determine for which month the payroll result is going to be taken into account.

Example

We have a weekly payroll result and we want to determine for which month this result should be taken into account. The payroll result begin date is 28.01.2002; the end date is 03.02.2002 and the pay date is 04.02.2002.

  • If we choose value B (begin date), this payroll result is going to be taken into account in January.
  • If we choose value E (end date), this payroll result is going to be taken into account in February.
  • If we choose value P (pay date), this payroll result is going to be taken into account in February.
History
Last changed by/on SAP  20030108 
SAP Release Created in 470