SAP ABAP Data Element P33_GANSW (Garnishment answer indicator)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PY-RU (Application Component) Russia
⤷ P99RU (Package) Human Resources: Cross-Country Objects Russia
⤷ PY-RU (Application Component) Russia
⤷ P99RU (Package) Human Resources: Cross-Country Objects Russia
Basic Data
Data Element | P33_GANSW |
Short Description | Garnishment answer indicator |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | P336_GANSW | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Answer ind |
Medium | 15 | Answer ind. |
Long | 20 | Answer indicator |
Heading | 1 | A |
Documentation
Definition
The reply indicator designates whether or not a reply to the garnishment document is to be sent to the garnishment originator. If one is to be sent enter the indicator. The field fixes the time when the letters are to be sent. If you insert a new garnishment you get a proposal from the view Garnishment Default Values (T5UG9).
Input values
You can use the following values:
- 1 - The reply is sent after each payment period.
- 2 - The reply is sent at the interval specified in the field Elapsed Days. The first reply is sent after the first retention amount in accordance with the number of days specified in the field Elapsed Days.
- 3 - The reply is sent at the interval specified in the field Elapsed Days. The first reply is sent after the first retention amount.
- 4 - The reply is sent at the interval specified in the field Elapsed Days. The first reply is sent after the specified Startdate reply in accordance with the number of days specified in the field Elapsed Days.
- 5 - The reply is sent at the interval specified in the field Elapsed Days. The first reply is sent on the specified date Startdate reply gesendet.
- 6 - The reply is not sent separately. The informaiton is printed on the check.
History
Last changed by/on | SAP | 20110809 |
SAP Release Created in |