SAP ABAP Data Element P13Q_PROJ_DATE (Leave Projection Date)
Hierarchy
☛
SAP_HRCAU (Software Component) Sub component SAP_HRCAU of SAP_HR
⤷ PA-PA-AU (Application Component) Australia
⤷ PB13 (Package) HR master data: Australia
⤷ PA-PA-AU (Application Component) Australia
⤷ PB13 (Package) HR master data: Australia
Basic Data
Data Element | P13Q_PROJ_DATE |
Short Description | Leave Projection Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proj Date |
Medium | 15 | Projection Date |
Long | 22 | Projection Date |
Heading | 10 | Proj Date |
Documentation
Definition
Denotes the date up to which leave accruals and entitlements are projected to determine liability figures.
Use
The date is only used in connection with the Leave Projection report. If you do not enter a date, the liability figures will be based on the date you enter in the Data Selection Period field.
History
Last changed by/on | SAP | 19990412 |
SAP Release Created in |