SAP ABAP Data Element P12_CNT12 (Indicator: count days of absence 1 in the resulting absence.)
Hierarchy
SAP_HRCBE (Software Component) Sub component SAP_HRCBE of SAP_HR
   PA-PA-BE (Application Component) Belgium
     PB12 (Package) HR Master Data: Belgium
Basic Data
Data Element P12_CNT12
Short Description Indicator: count days of absence 1 in the resulting absence.  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cnt.1.in.2 
Medium 20 Count abs.1 in abs.2 
Long 28 Count absence 1 in absence 2 
Heading 10 Cnt.1.in.2 
Documentation

Definition

This allows you to take over the count of days of the earliest starting absence (absence 1) into the resulting absence.

Use

Check this indicator to have the count of days of absence 1 into the resulting absence.

Example

If an absence starts on the 1st and the colliding absence starts on the 3rd, having this indicator set will result in having the day count for the resulting absence (the result of the collision, which could be a different absence category than the two that collide and which starts on the 3rd) starting from 2 instead of 0.

History
Last changed by/on SAP  20031111 
SAP Release Created in 46C