SAP ABAP Data Element P106_VALDY (Valid days for calculating end date)
Hierarchy
SAP_HRCUS (Software Component) Sub component SAP_HRCUS of SAP_HR
   PY-US (Application Component) USA
     PC10 (Package) HR accounting: USA
Basic Data
Data Element P106_VALDY
Short Description Valid days for calculating end date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM03    
Data Type NUMC   Character string with only digits 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Valid days 
Medium 15 Valid days 
Long 20 Valid days 
Heading Day 
Documentation

Definition

The garnishment is good for specified number of days.

Dependencies

If you insert a garnishment and enter the number of days, an entry will automatically be inserted from the infotype Adjustment - Enddate (this will take place in the background). If you change the Status of a garnishment from Pending to Active, the system will limit the infotype Garnishment Order on the end date calculated (this will be done in batch).

History
Last changed by/on SAP  20020124 
SAP Release Created in