SAP ABAP Data Element P08_WK_BEGDA (Start date of week)
Hierarchy
SAP_HRCGB (Software Component) Sub component SAP_HRCGB of SAP_HR
   PY-GB (Application Component) United Kingdom
     PC08 (Package) HR accounting: GB
Basic Data
Data Element P08_WK_BEGDA
Short Description Start date of week  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Week start 
Medium 18 Start date of week 
Long 20 Start date of week 
Heading 10 Week Start 
Documentation

Definition

Start date of calculation week for

  • SAP, SMP or SPP
  • OAP, OMP or OPP

Note:

SAP, SMP and SPP are calculated on a weekly basis, up to 26 weeks for SAP and SMP and 2 weeks for SPP.

For both statutory and occupational payments, the payment per week is calculated for the seventh day in each week, that is, the end date of the calculation week.

History
Last changed by/on SAP  20050109 
SAP Release Created in 600