SAP ABAP Data Element P06_AUSZL (Payment I)
Hierarchy
SAP_HRCFR (Software Component) Sub component SAP_HRCFR of SAP_HR
   PY-FR (Application Component) France
     PC06 (Package) HR Payroll: France
Basic Data
Data Element P06_AUSZL
Short Description Payment I  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PABRP    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Payment I 
Medium 15 Payment I 
Long 20 Payment I 
Heading Paymt 
Documentation

Definition

Corresponds to the date of the first bonus/allowance payment which is expressed by specifying the number of months that are to be taken into consideration up to this date.

The formula to retrieve the value to be entered in this attribute is:

  • AUSZL = Month of payment - Start (1st column of the view) + 1 + 12 x i

    i = 0 if paid in the same year, 1 if paid the following year etc.

Example

The employee benefits from an exceptional bonus between July 2012 and September 2012. The first bonus payment is made in October 2012:

Start    Duration    Payment I

7    3    4       

  • Start: 7 Corresponds to the start (month) of the period for which the bonus is granted.
  • Duration: 3 Corresponds to the duration of the bonus
  • Payment I: 4 Corresponds to the duration (in months) until bonus payment, including the month in which the payment is made.

The employee benefits from an exceptional bonus between the 1st of June 2012 and the 31st of May 2013. The first payment is made on 1st of June 2013. The values are as follows:

Start    Duration    Payment I

6    12    13   

  • Start: 6 as the start of the exceptional payment reference period over the period considered is June 2012 and the first payment is made in June 2013.
  • Duration: 12 as the start of the exceptional payment reference period over the period considered is in June 2012 and the first payment is made in June 2013.
  • Payment I: 13 as the start of the exceptional payment reference period is in June 2012 and the first payment is made in June 2013.

In the case of a payment discrepancy, it is important to consider the start month, and not the payroll periods.

Example:

The employee has an exceptional bonus from July 2012 (payroll period 08) to September 2012 (payroll period 10). The first bonus installmement is paid in October 2012 (payroll period 11):

  • Start: 7 Corresponds to the start (month) of the period for which the bonus has been granted
  • Duration: 3 Corresponds to the duration of the bonus
  • Payment I: 4 Corresponds to the duration specified in months until payment of the bonus, from June 2012 to May 2013. The first installment is paid in June 2013. The values are therefore as follows:

Start    Duration    Payment I

6    12    13

History
Last changed by/on SAP  20130529 
SAP Release Created in