SAP ABAP Data Element P05EIR_IND_WD_ZATERDAG (First Saturday of Absence Period is a Workday)
Hierarchy
SAP_HRCNL (Software Component) Sub component SAP_HRCNL of SAP_HR
   PA-PA-NL (Application Component) Netherlands
     PB05 (Package) HR Master Data: Netherlands
Basic Data
Data Element P05EIR_IND_WD_ZATERDAG
Short Description First Saturday of Absence Period is a Workday  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 1stSatWday 
Medium 15 1st Sat Wday 
Long 35 First Sat. of Abs. Per. is Wday 
Heading 35 First Sat. of Abs. Per. is Wday 
Documentation

Definition

Indicates whether the first Saturday in the absence period was originally a workday for the employee.

Use

Dependencies

Example

The employee falls ill on Wednesday, April 6 2011 and goes on sick leave for 2 weeks. Since Saturday April 9, 2011 was originally a workday for the employee, the system sets this indicator to yes.

History
Last changed by/on SAP  20130529 
SAP Release Created in