SAP ABAP Data Element P05_SCDAYS (Cal. days of Att./absence record relevant for selection)
Hierarchy
☛
SAP_HRCNL (Software Component) Sub component SAP_HRCNL of SAP_HR
⤷ PA-PA-NL (Application Component) Netherlands
⤷ PB05 (Package) HR Master Data: Netherlands
⤷ PA-PA-NL (Application Component) Netherlands
⤷ PB05 (Package) HR Master Data: Netherlands
Basic Data
Data Element | P05_SCDAYS |
Short Description | Cal. days of Att./absence record relevant for selection |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | P05_SCDAYS | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sel.cal.d |
Medium | 16 | Sel. cal. days |
Long | 40 | Cal. days of record for selection |
Heading | 10 | Sel.cal.d |
Documentation
Definition
In the Reporting absence (RPLWPAN0) report, this field displays the number of calendar days that are relevant for the selection interval. Two cases can be distinguished:
- Reporting sick in the framework of the Eligibility for Permanent Invalidity Benefit (Restrictions) Act
In this case, the Calendar days of a record relevant for the selection field displays the number of calendar days of the relevant record up to and including the last day of the selection period. The calendar days of the record that fall before the selection period are also relevant and are counted. The calendar days that fall after the selection period are not counted. - Reporting absence with Attendance/absence codes
In this case, the Calendar days of a record relevant for the selection field displays the number of calendar days of the relevant record that fall within the selection period. Calendar days of the record that fall before or after the selection period are therefore not counted.
Use
Dependencies
Example
History
Last changed by/on | SAP | 20030714 |
SAP Release Created in | 470 |