SAP ABAP Data Element P05_DTINC (Increase Standard of Education Start Date)
Hierarchy
☛
SAP_HRCNL (Software Component) Sub component SAP_HRCNL of SAP_HR
⤷
PA-PA-NL (Application Component) Netherlands
⤷
PB05 (Package) HR Master Data: Netherlands

⤷

⤷

Basic Data
Data Element | P05_DTINC |
Short Description | Increase Standard of Education Start Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Start Date |
Medium | 17 | Start Date |
Long | 32 | Increase Std of Educ. Start Date |
Heading | 32 | Increase Std of Educ. Start Date |
Documentation
Definition
Specifies the start date that applies to the activities that will increase the standard of education for the employee.
Use
You use this field to specify the start date that applies to the employee's education activities. These activities result in an increase in the standard of education for the employee.
Dependencies
A start date can only be specified if the Increase Standard of Education checkbox is selected and the date occurs within 2010.
If the date specified is valid, then the payment reduction is processed in the corresponding period.
Example
History
Last changed by/on | SAP | 20110809 |
SAP Release Created in |