SAP ABAP Data Element P02_PARVR (Parallel processing variant)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PA-PF-XX (Application Component) Pension fund: General Parts
⤷ PK02 (Package) HR: Pension Fund International Parts
⤷ PA-PF-XX (Application Component) Pension fund: General Parts
⤷ PK02 (Package) HR: Pension Fund International Parts
Basic Data
Data Element | P02_PARVR |
Short Description | Parallel processing variant |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | P02_PARVR | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table | T5CPT |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | ParVar |
Medium | 16 | ParallelVariant |
Long | 25 | Parallel processing var. |
Heading | 6 | ParVar |
Documentation
Definition
The parallel processing variant determines in which system/application server the execution of the current report is distributed, and where the result is processed.
More exactly: When parallel processing, the report is started in several systems with the scheduler RPMREP00, with so-called RFC destinations. After these reports have finished the data creation, they return the determined data to the calling program. A RFC destination is also used here.
You must specify these RFC destinations when calling up the scheduler. The parallel processing variant enables, per Customizing, the definition of the necessary RFC destinations as default values when you call up the scheduler.
History
Last changed by/on | SAP | 19981111 |
SAP Release Created in |