SAP ABAP Data Element P01C_ZRHOR (Projection of Basic Value to 100%)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element | P01C_ZRHOR |
Short Description | Projection of Basic Value to 100% |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Proj.Basis |
Medium | 15 | Project Basis |
Long | 20 | Basis Projection |
Heading | 2 | PB |
Documentation
Definition
If this indicator is set, the income entered with a percentage factor in the CPS database is increase to 100% in the basis calculation.
Example
Income from part-time employees is set with a part-time percentage of 50% in the CPS database. If this indicator is set, the income is projected to 100%.
History
Last changed by/on | SAP | 19990312 |
SAP Release Created in |