SAP ABAP Data Element P01C_ZRHOR (Projection of Basic Value to 100%)
Hierarchy
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
   PA-PF-DE (Application Component) Company Pension Scheme Germany
     P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element P01C_ZRHOR
Short Description Projection of Basic Value to 100%  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Proj.Basis 
Medium 15 Project Basis 
Long 20 Basis Projection 
Heading PB 
Documentation

Definition

If this indicator is set, the income entered with a percentage factor in the CPS database is increase to 100% in the basis calculation.

Example

Income from part-time employees is set with a part-time percentage of 50% in the CPS database. If this indicator is set, the income is projected to 100%.

History
Last changed by/on SAP  19990312 
SAP Release Created in