SAP ABAP Data Element P01C_RMDAY (Date Limit for Monthly Rounding Up/Down)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element | P01C_RMDAY |
Short Description | Date Limit for Monthly Rounding Up/Down |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | P01C_DAYMA | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date Limit |
Medium | 15 | Date Limit |
Long | 20 | Rounding Day Limit |
Heading | 6 | Dt Lim |
Documentation
Definition
The day threshold must not or need not be reached for a started month, depending on which rounding rule is used.
- Count started month in full
If this day threshold is reached in the started month, it is counted, in other words, depending on whether this is the start or end, the month is paid from the first day of the month or to the last day of the month. - Do not count started month
If this day threshold is not reached in the started month, it is not counted. Depending on whether this is the start or end, the month is either counted from the first day of the following month or up to the last day of the previous month.
Notes
If no entry is made in the day threshold, the condition is always met.
History
Last changed by/on | SAP | 19990312 |
SAP Release Created in |