SAP ABAP Data Element P01C_PRZSI (Bonus Percentage Rate for Late Utilization of Resources)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element | P01C_PRZSI |
Short Description | Bonus Percentage Rate for Late Utilization of Resources |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRZNT | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 7 | |
Decimal Places | 4 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Percentage |
Medium | 15 | Bonus |
Long | 20 | Percent Bonus |
Heading | 5 | PerBo |
Documentation
Definition
If the pension benefit is paid early or later than planned, a arithmetic bonus or deduction can be calculated. To do this, the period between the pension payment and the final age of the pension plan is calculated. If the pension payment is after the date on which the pension recipient reaches the final age as defined in the pension plan, a bonus is paid for the resulting period. If the date is earlier, a deduction is calculated.
The bonus/deduction is calculated as a percentage for each time unit. In this field, you can define a percentage rate for the deduction. If the percentage rate has not been entered, no deduction is calculated for the entitlement.
History
Last changed by/on | SAP | 20070912 |
SAP Release Created in |