SAP ABAP Data Element P01C_MAPSI (Maximum Percentage Bonus for Late Utilization of ER Resourc.)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷
PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷
P01A (Package) HR Germany: Retirement Pension Plan
⤷
⤷
Basic Data
| Data Element | P01C_MAPSI |
| Short Description | Maximum Percentage Bonus for Late Utilization of ER Resourc. |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | PRZNT | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 7 | |
| Decimal Places | 4 | |
| Output Length | 8 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Max. Prcnt |
| Medium | 15 | Max. % Bonus |
| Long | 20 | Max. Percent Bonus |
| Heading | 6 | MaxPrc |
Documentation
Definition
If a benefit is paid early or later, mathematical bonuses or deductions can be calculated.
The bonuses/deductions are calculated as percentages and upper or lower limits can be set.
If the benefit is paid later, this bonus percentage is considered the maximum percentage even if a higher percentage were to be calculated.
History
| Last changed by/on | SAP | 20070912 |
| SAP Release Created in |