SAP ABAP Data Element P01C_MAPSI (Maximum Percentage Bonus for Late Utilization of ER Resourc.)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
⤷ PA-PF-DE (Application Component) Company Pension Scheme Germany
⤷ P01A (Package) HR Germany: Retirement Pension Plan
Basic Data
Data Element | P01C_MAPSI |
Short Description | Maximum Percentage Bonus for Late Utilization of ER Resourc. |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | PRZNT | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 7 | |
Decimal Places | 4 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Max. Prcnt |
Medium | 15 | Max. % Bonus |
Long | 20 | Max. Percent Bonus |
Heading | 6 | MaxPrc |
Documentation
Definition
If a benefit is paid early or later, mathematical bonuses or deductions can be calculated.
The bonuses/deductions are calculated as percentages and upper or lower limits can be set.
If the benefit is paid later, this bonus percentage is considered the maximum percentage even if a higher percentage were to be calculated.
History
Last changed by/on | SAP | 20070912 |
SAP Release Created in |