SAP ABAP Data Element P01_VGBDAT (Key Date for Default Disruptive Event Income Thresh. Deficit)
Hierarchy
☛
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
⤷ PA-PA-DE (Application Component) Germany
⤷ PB01 (Package) HR Master Data: Germany
⤷ PA-PA-DE (Application Component) Germany
⤷ PB01 (Package) HR Master Data: Germany
Basic Data
Data Element | P01_VGBDAT |
Short Description | Key Date for Default Disruptive Event Income Thresh. Deficit |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date |
Medium | 15 | Key Date |
Long | 37 | Key Date for Default Disr.Event ITD |
Heading | 10 | Key Date |
Documentation
Definition
The key date is interpreted by report RPCSVWD0 as follows during calculation of the income threshold deficit for disruptive events:
- If the key date of the specification is the first day of the processed period (payroll period or SI split period), the replacement/correction is carried out before the report processes the period.
Therefore, the income threshold deficit for disruptive events can change as a result of releases or accrual in the period under examination.
- If the key date of the specification lies within a period that the report processes, then the replacement/correction is carried out after the period is processed.
Therefore, if a correction occurs (specification type "Correction Values"), the income threshold deficit for disruptive events is corrected at the end of the period - that is, after considering any releases and accrual. If a replacement (specification type "Starting Values") applies, the calculation for the current period is ignored and the income threshold deficit for disruptive events is replaced by the specification values at the end of the period.
History
Last changed by/on | SAP | 20010720 |
SAP Release Created in | 470 |