SAP ABAP Data Element P01_EHVE_AUSWJ_AKTQ (Current Evaluation Period)
Hierarchy
SAP_HRCDE (Software Component) Sub component SAP_HRCDE of SAP_HR
   PY-DE (Application Component) Germany
     PC01 (Package) HR Payroll: Germany
Basic Data
Data Element P01_EHVE_AUSWJ_AKTQ
Short Description Current Evaluation Period  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type GJAHR    
Data Type NUMC   Character string with only digits 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short CurrPer 
Medium 16 Current Period 
Long 32 Current Evaluation Period 
Heading 32 Current Evaluation Period 
Documentation

Definition

Period in which the current evaluation is started.

Use

This field can normally be left blank.

The report then takes into account all retroactive accounting that takes place on the preceding periods in the evaluation quarter. Retroactive accounting from later periods is not taken into account in the evaluation quarter.

This parameter allows retroactive accounting that takes place in later periods to be taken into account in the evaluation quarter. For this, set the parameter to the highest in-period whose retroactive accounting should be taken into account.

In the evaluation for the next quarter, enter this period in the parameter Period of the last evaluation so that the retroactive accounting does not have to be processed again.

Example

For the survey of earnings for the first quarter 2007, retroactive accounting from 04/2007 should be taken into account in the evaluation quarter 01/2007 - 03/2007.

Set the parameter Period of the current evaluation to 04/2007.

Result: Retroactive accounting from 04/2007 on 02/2007 is taken into account in the survey. Retroactive accounting from 05/2007 on 02/2007 is not taken into account.

For the survey of earnings for the second quarter of 2007, set the parameter Period of the last evaluation to 04/2007 so that the retroactive accounting from 04/2007 does not need to be processed again.

History
Last changed by/on SAP  20071120 
SAP Release Created in