Hierarchy
⤷ IS-OIL-DS-SSR (Application Component) Service Station Retailing
⤷ OIR (Package) SSR Service Station Retailing (master/overall)
Basic Data
Data Element | OIRA_PCDATE |
Short Description | Process execution date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATE | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date |
Medium | 15 | Proc.exec.date |
Long | 20 | Proc.execution date |
Heading | 2 | ED |
Documentation
Definition
Date on which a specific process is carried out.
Supplementary Documentation - OIRA_PCDATE0001
Procedure
Please specify the date when the process is to be carried out. The date will influence the program when the process status table is being updated.
If service station partner invoicing is run using the job scheduler, and no date is specified either on the screen or in a variant, the current date will be defaulted each time the job scheduler runs the program.
However, if a specific date is specified and used in a variant when calling the job scheduler, that date will be used instead of the default of the current date.
Examples
Dependencies
Supplementary Documentation - OIRA_PCDATE0002
Procedure
Specify the date on which the prerequisite process check is to be carried out. That date will be used by the program when the status table is checked for prerequisite process execution.
Examples
Dependencies
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |