SAP ABAP Data Element OIRA_PCDATE (Process execution date)
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-DS-SSR (Application Component) Service Station Retailing
     OIR (Package) SSR Service Station Retailing (master/overall)
Basic Data
Data Element OIRA_PCDATE
Short Description Process execution date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATE    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Date 
Medium 15 Proc.exec.date 
Long 20 Proc.execution date 
Heading ED 
Documentation

Definition

Date on which a specific process is carried out.

Supplementary Documentation - OIRA_PCDATE0001

Procedure

Please specify the date when the process is to be carried out. The date will influence the program when the process status table is being updated.

If service station partner invoicing is run using the job scheduler, and no date is specified either on the screen or in a variant, the current date will be defaulted each time the job scheduler runs the program.

However, if a specific date is specified and used in a variant when calling the job scheduler, that date will be used instead of the default of the current date.

Examples

Dependencies

Supplementary Documentation - OIRA_PCDATE0002

Procedure

Specify the date on which the prerequisite process check is to be carried out. That date will be used by the program when the status table is checked for prerequisite process execution.

Examples

Dependencies

History
Last changed by/on SAP  20050224 
SAP Release Created in