Hierarchy
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_ROUTE_TOLERANCE |
Short Description | Tolerance in percent for stage duration for timestamp check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT1 | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Tolerance |
Medium | 15 | Route Tolerance |
Long | 20 | Route Tolerance |
Heading | 15 | Route Tolerance |
Documentation
Definition
The tolerance as a percentage, for the duration of a stage within a route, compared to the scheduled dates and times entered in the nomination items.
Use
When checking the scheduled date & time in the nomination item against the route and stages, an exact check is performed. Nevertheless, it is possible to allow a certain tolerance, where no error or warning is issued.
Dependencies
Example
Route stage from location A to location B has a duration of 20 days.
The scheduled nomination items are scheduled for October 1st at location A and October 20th at location B. The difference is 19 days.
Without a tolerance set, the time check would result in an error.
Setting a tolerance of 10 %, a range of 18 to 22 days would be allowed, so the time check would not produce any errors.
History
Last changed by/on | SAP | 20130529 |
SAP Release Created in | 46C |