SAP ABAP Data Element OIJ_PMENG (OIL-TSW: Document (item) quantity not yet scheduled)
Hierarchy
☛
IS-OIL (Software Component) IS-OIL
⤷
IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷
OIJ (Package) TSW Traders and Schedulers Workbench
⤷
⤷
Basic Data
| Data Element | OIJ_PMENG |
| Short Description | OIL-TSW: Document (item) quantity not yet scheduled |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | MENGE | |
| Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
| Length | 13 | |
| Decimal Places | 3 | |
| Output Length | 17 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | DocItQuan |
| Medium | 15 | DocItQuantity |
| Long | 20 | Doc item quantity |
| Heading | 0 |
Documentation
Definition
Unscheduled quantity in either the item or item schedule line of a sales or purchase order which references the TSW location. The unscheduled quantity is determined by matching the document item no. against a document reference in a TSW nomination and subtracting the quantity scheduled against the document in the TSW nomination item.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in |