SAP ABAP Data Element OIJ_PERIOD (OIL-TSW: Rolling period)
Hierarchy
☛
IS-OIL (Software Component) IS-OIL
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_PERIOD |
Short Description | OIL-TSW: Rolling period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ANZTA | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ROLLINGPERIOD | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Rolling |
Medium | 15 | Rolling period |
Long | 20 | Rolling period |
Heading | 4 | Roll |
Documentation
Definition
The value you enter for the rolling period determines the number of days for which the system generates the Stock Projection Worksheet. The Rolling Period together with the Days in Past field, determine the start and end date for the Stock Projection Worksheet.
Example
A rolling period of 60 days with a value of 5 in the Days in Past field results in a Stock Projection Worksheet that covers five days prior to the current date and 55 days into the future.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |