Hierarchy
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_PAST |
Short Description | OIL-TSW: Number of days in the past |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ANZTA | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | DAYSINTHEPAST | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Past days |
Medium | 15 | Days in past |
Long | 20 | Days in past |
Heading | 4 | Past |
Documentation
Definition
The value you enter in the Days in Past field determines how many days in the past the system takes into account when calculating the Stock Projection Worksheet. This field also determines which nominations the system uses when summing up the unactualised nomination quantities. The system only calculates nominations with dates after the current day, minus the value in the Days in Past field.
Example
If you enter 10 days in this field, the Stock Projection Worksheet shows stock projection data for 10 days prior to the current day.
The days in the past together with the rolling period determine the total display horizon of the Stock Projection Worksheet.
However, you can view stock projection beyond this time period, by selecting Page-up or Page-down in the Stock Projection Worksheet.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |