SAP ABAP Data Element OIJ_IMBPL_D (Imbalance Planned Average)
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
     OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element OIJ_IMBPL_D
Short Description Imbalance Planned Average  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MENG13V    
Data Type QUAN   Quantity field, points to a unit field with format UNIT 
Length 13    
Decimal Places 3    
Output Length 18    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Im Pl Avg 
Medium 16 Imb Planned Avg 
Long 31 Imbalance Planned Average 
Heading 31 Imbalance Planned Average 
Documentation

Definition

Displays the average imbalance quantity between the total planned goods issues and the total planned goods receipts for the selected time period in Location Balancing. You calculate this for a given material at a given location.

Use

It is calculated by dividing the difference between the planned goods issue quantity and the planned goods receipt quantity by the time period in which this data was entered in the system.

Dependencies

Example

You want to calculate the average daily imbalance quantity over a period of 30 days:

Quantity of planned goods issues over 30 days    180,000 liters

Quantity of planned goods receipts over 30 days    120,000 liters

Planned imbalance quantity over 30 days    60,000 liters

Average planned imbalance quantity per day    2,000 liters

History
Last changed by/on SAP  20050224 
SAP Release Created in 46C