Hierarchy
⤷ IS-OIL-DS-TSW (Application Component) Trader's and Scheduler's Workbench
⤷ OIJ (Package) TSW Traders and Schedulers Workbench
Basic Data
Data Element | OIJ_AUTOCONF |
Short Description | Automatic confirmation Flag |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | AUTOCONFIRM | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 9 | Autoconf. |
Medium | 11 | Autoconfirm |
Long | 21 | Automtic Confirmation |
Heading | 9 | Autoconf. |
Documentation
Definition
The automatic confirmation indicator is used to enable nomination line items to be confirmed during scheduling. This is dependent on the masterdata settings of the transport system and material, or location and material.
Example
- The nomination schedule is done for:
Transport system 'A'
Location 'B'
Materials 'C' and 'D'
In the master data for transport system 'A' and material 'C', the indicator is set.
After saving the nomination, the matching schedule with the 'C'- material is set to status 4 but the schedule for material 'D' remains at 'planned'.
- The nomination schedule is done for:
Location 'A', materials 'B' and 'C' (such as scheduling in-tank transfers)
In the master data for location 'A' and material 'C', the indicator is set. After saving the nomination, the matching schedule with the 'C'- material is set to status 4 but the schedule for material 'B' remains 'planned'.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 46C |