SAP ABAP Data Element OII_UNPPC (Unpumpable quantity expressed as perc. of total capacity)
Hierarchy
IS-OIL (Software Component) IS-OIL
   IS-OIL-DS-BDR (Application Component) Bulk Distribution Requirements Planning
     OII (Package) BDRP Bulk Distribution Requirement Planning
Basic Data
Data Element OII_UNPPC
Short Description Unpumpable quantity expressed as perc. of total capacity  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type PRZ22    
Data Type DEC   Counter or amount field with comma and sign 
Length 4    
Decimal Places 2    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 UnP.% 
Medium 15 Unp.qty. % 
Long 20 Unpumpable qty. % 
Heading UnP.% 
Documentation

Definition

The amount of material remaining after pump scavenging of the storage object is no longer feasible. This is expressed as a percentage of the total capacity of the storage object. It follows that a low percentage value will indicate an effective design of pump intake and/or sump (at least for tank clearance purposes). The usable volume of the tank is therefore:

total capacity - (total capacity * unpumpable percentage / 100)

Procedure

Enter the unpumpable quantity of the storage object expressed as a percentage of the maximum capacity of the storage object.

Examples

A service station can reassign the use of a particular tank from leaded petroleum to unleaded petroleum if the traces of leaded petroleum in the resulting blend do not exceed over 0.001% of the total volume of product after delivery. Above this amount damage could occur to the catalytic converters of cars using unleaded petroleum from this tank. If the unpumpable quantity of the tank exceeds 0.001% of the total capacity of the tank, the re-assignment of use will not be possible without manual extraction of the residue of leaded petroleum before the first delivery of unleaded petroleum.

History
Last changed by/on SAP  20050224 
SAP Release Created in