SAP ABAP Data Element N2GL_RP_DECISION_DURATION (pathways Interval to Next Step (in Pathway Time Unit))
Hierarchy
☛
IS-H (Software Component) SAP Healthcare
⤷
IS-HMED (Application Component) Clinical System
⤷
NMED_GL (Package) IS-H*MED: Treatment Pathways
⤷
⤷
Basic Data
| Data Element | N2GL_RP_DECISION_DURATION |
| Short Description | pathways Interval to Next Step (in Pathway Time Unit) |
Data Type
| Category of Dictionary Type | Direct Type Entry | |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | ||
| Data Type | INT4 | 4-byte integer, integer number with sign |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 11 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Interval |
| Medium | 15 | Interval |
| Long | 25 | Interval to Next Step |
| Heading | 25 | Interval to Next Step |
Documentation
Definition
Specifies the time difference between two steps. The time unit entered on the treatment pathway applies.
Use
The time interval is used to calculate the planned times of a step.
Dependencies
In the graphic of a treatment pathway this value appears in the middle of the outgoing connector of a step.
Example
A treatment pathway with the Days time unit has the steps A and B. Step A has the planned date 12.01. 2 is entered as the time interval. Result: The step B which follows step A has the planned date 14.01.
History
| Last changed by/on | SAP | 20070917 |
| SAP Release Created in | 700 |