SAP ABAP Data Element N2GL_DURATION_PLANNED (pathways Duration of Pathway Processing (Days))
Hierarchy
☛
IS-H (Software Component) SAP Healthcare
⤷
IS-HMED (Application Component) Clinical System
⤷
NMED_GL (Package) IS-H*MED: Treatment Pathways
⤷
⤷
Basic Data
| Data Element | N2GL_DURATION_PLANNED |
| Short Description | pathways Duration of Pathway Processing (Days) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | N2GL_DURATION | |
| Data Type | INT4 | 4-byte integer, integer number with sign |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 11 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PlanDurat |
| Medium | 15 | Plan Start-End |
| Long | 25 | Planned Dur. Start-End |
| Heading | 20 | Plan Start-End |
Documentation
Definition
Planned duration of a patient pathway
Use
Dependencies
The planned duration is dependent on the path that the patient pathway takes.
If decisions are still outstanding or the patient pathway is in a treatment break, the planned duration cannot be calculated.
Example
History
| Last changed by/on | SAP | 20070917 |
| SAP Release Created in | 700 |