SAP ABAP Data Element N2GL_DURATION_PLANNED (pathways Duration of Pathway Processing (Days))
Hierarchy
☛
IS-H (Software Component) SAP Healthcare
⤷ IS-HMED (Application Component) Clinical System
⤷ NMED_GL (Package) IS-H*MED: Treatment Pathways
⤷ IS-HMED (Application Component) Clinical System
⤷ NMED_GL (Package) IS-H*MED: Treatment Pathways
Basic Data
Data Element | N2GL_DURATION_PLANNED |
Short Description | pathways Duration of Pathway Processing (Days) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | N2GL_DURATION | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 11 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PlanDurat |
Medium | 15 | Plan Start-End |
Long | 25 | Planned Dur. Start-End |
Heading | 20 | Plan Start-End |
Documentation
Definition
Planned duration of a patient pathway
Use
Dependencies
The planned duration is dependent on the path that the patient pathway takes.
If decisions are still outstanding or the patient pathway is in a treatment break, the planned duration cannot be calculated.
Example
History
Last changed by/on | SAP | 20070917 |
SAP Release Created in | 700 |