SAP ABAP Data Element MONTHINT (Monthly Interest Calculation)
Hierarchy
FI-CA (Software Component) FI-CA
   FI-CA-BT-IC (Application Component) Interest Calculation
     FKKZ (Package) Interest Calculation FI/ CA: Common Objects
Basic Data
Data Element MONTHINT
Short Description Monthly Interest Calculation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type MONTHINT    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 MonthlyIC 
Medium 15 MonthlyIntCal. 
Long 20 MonthlyIntCalcul 
Heading 18 MonthlyIntCalcul 
Documentation

Use

You can calculate interest on the basis of months that have been completed or months that have been started.

In each case this concerns interest calculation relating to a key date in the month.

Example 1

Interest has never been calculated on a particular item before and is now to be calculated for the period from April 10, 2004 to May 15, 2004.

A) Months started:

Since these dates occur in two consecutive months, interest will be calculated for two months. The interest rates applicable on the two dates are used. The key date used for the month is '10'.

B) Months completed:

On May 9, 2004 the first month is complete. The second month will only be complete on June 9, 2004. Interest will be calculated for one month only and the key date will be '09'.

Example 1, Update

Interest is to be calculated subsequently up to June 09, 2004. The interest history shows that interest was previously calculated up to May 15, 2004. The new period is from May 16, 2004 to June 09, 2004.

A) Months started:

The key date '10' is read from the interest history. This does not appear in the period for which interest is to be calculated, therefore, interest will be zero.

B) Months completed:

Key date '09' is read from the interest history. This date is contained once in the period for which interest is to be calculated. Interest is calculated for one month.

Note

Particular aspects of the key date in the month:

  • If the first date to be calculated for interest is the first of the month, then '31' is used as the key date when calculating interest on the basis of a whole month.
  • For days at the end of the month that do not apply, you can set the key date to the last possible day in the same calendar month or to the day after.

Example 2

The first date for interest calculation is January 31, 2004.

A) Months started:

The key date stored in the interest history is '31'. If you selected key date in calendar month, the last possible date in the calendar month will be used. The sequence of days in which the interest for a month is due is: Jan. 31, Feb. 28, March 31, April 30 and so on.

B) Months completed:

The key date stored in interest history is '30'. If you selected Move key date to next one as applicable, the sequence of days in which the interest for a month is due will be: March 1, March 30, April 30, and so on.

Note for SAP Insurance

This field is only relevant for item interest calculation.

History
Last changed by/on SAP  20050224 
SAP Release Created in