SAP ABAP Data Element LATEST_NEW_AFT (Period for Retroactive Leave Requests)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷
PT (Application Component) Personnel Time Management
⤷
PTIM (Package) HR Time Management Application Development

⤷

⤷

Basic Data
Data Element | LATEST_NEW_AFT |
Short Description | Period for Retroactive Leave Requests |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | INT4 | |
Data Type | INT4 | 4-byte integer, integer number with sign |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | LatestReq |
Medium | 25 | Latest Request |
Long | 60 | Latest Request Afterwards (Time Diff.) |
Heading | 60 | Latest Request Afterwards (Time Difference) |
Documentation
Definition
Specifies for each type of leave the length of time in which leave requests can be submitted retroactively.
Use
The period you enter here relates to the end date of the leave.
You indicate the period as follows:
- Before the start date of leave: Minus sign (-) before or after the number
- Start date of leave: BLANK or 0
- After the start date of leave: No plus/minus sign
- No deadline: Highest possible negative number (for example 99- (years))
Dependencies
Example
You specify that employees must submit requests for vacation two weeks after the end of the vacation at the latest. You therefore enter "2" (weeks) in this field.
On April 5, an employee requests leave that ended on March 15. The system does not accept the request. The employee has to submit the request by March 30 at the latest.
History
Last changed by/on | SAP | 20031111 |
SAP Release Created in | 470 |