Hierarchy
⤷ IS-B-RA (Application Component) Risk Analysis
⤷ JBR (Package) Application development IS-B Risk Mangement
Basic Data
Data Element | JBRLZB_GUV |
Short Description | P+L Maturity Band |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | JBRLZB | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | JBRLZB |
Further Characteristics
Search Help: Name | S_JBRLZB_LZBID | |
Search Help: Parameters | LZB | |
Parameter ID | LZB | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | MB in P+L |
Medium | 20 | Mat.Band in P+L Eval |
Long | 40 | Maturity Band in P+L Evaluation |
Heading | 7 | P+L MB |
Documentation
Definition
The maturity band determines in which time periods the results of the evaluations are shown. When you enter the start date of a maturity band, you differentiate between absolute maturity bands and relative maturity bands.
- Absolute maturity bands have a fixed start date. If the evaluation date/horizon is before the start date you defined, then the first maturity band date shown in the evaluations is the horizon.
- Relative maturity bands do not have a start date. Instead, the time periods defined by the maturity band are generated on the basis of another date and dependent on the evaluation:
- NPV evaluations: Reference date is the evaluation date
- Gap, ALM: Reference date is the horizon
For more information on the maturity band see the online documentation under SAP Banking -> SEM -> Asset/Liability Management -> Controlling the ALM Evaluations -> Maturity Band.
Use
When you run an ALM simulation, you have the option of choosing an additional maturity band: the profit and loss maturity band.
If you choose a profit and loss maturity band, in the profit and loss evaluation the system calculates only the results for the maturity band dates of the profit and loss maturity band. By default, the value 0 is shown for the other maturity band dates. If you do not use a profit and loss maturity band, then in the profit and loss evaluation the system displays the results for each maturity band date of the normal maturity band.
Dependencies
If you use a profit and loss maturity band, the dates of the profit and loss maturity band are added to the maturity band used in gap analysis/ALM simulation.
Example
Maturity band P+L Maturity Band Gap Analysis Position Evaluation Profit and Loss Evaluation
(For example, asset-side volume) (For example, write-down amount)
01/31/01 01/31/01 100 000 0
02/28/01 02/28/01 100 000 0
03/31/01 03/31/01 100 000 0
04/30/01 04/30/01 100 000 0
05/31/01 05/31/01 100 000 0
06/30/01 06/30/01 100 000 0
12/31/01 12/31/01 100 000 35 000
06/30/02 06/30/02 100 000 0
12/31/02 12/31/02 100 000 500
06/30/03 06/30/03 100 000 0
Supplementary Documentation - JBRLZB_GUV0001
Use
When you run an ALM simulation, you have the option of choosing an additional maturity band: the profit and loss maturity band.
If you choose a profit and loss maturity band, in the profit and loss evaluation the system calculates the results for the maturity band dates of the profit and loss maturity band only. By default, the value 0 is shown for the other maturity band dates. If you do not use a profit and loss maturity band, then in the profit and loss evaluation the system displays the results for each maturity band date of the normal maturity band.
Dependencies
If you use a profit and loss maturity band, the dates of the profit and loss maturity band are added to the maturity band used in gap analysis/ALM simulation.
Example
Maturity band P+L Maturity Band Position Evaluation Profit and
(For example, asset-side volume) (For example, write-down amount)
01/31/01 01/31/01 100 000 0
02/28/01 02/28/01 100 000 0
03/31/01 03/31/01 100 000 0
04/30/01 04/30/01 100 000 0
05/31/01 05/31/01 100 000 0
06/30/01 06/30/01 100 000 0
12/31/01 12/31/01 100 000 35 000
06/30/02 06/30/02 100 000 0
12/31/02 12/31/02 100 000 500
06/30/03 06/30/03 100 000 0
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in | 110 |