SAP ABAP Data Element JBDGBEGI (Date of Transaction Start)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ IS-B-DP (Application Component) Transaction Data Pool
⤷ JBD (Package) Application development IS-B Data Pool
⤷ IS-B-DP (Application Component) Transaction Data Pool
⤷ JBD (Package) Application development IS-B Data Pool
Basic Data
Data Element | JBDGBEGI |
Short Description | Date of Transaction Start |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Trans.Strt |
Medium | 15 | Trans. Start |
Long | 20 | Transaction start |
Heading | 0 |
Documentation
Definition
This date is only used in the flexible procedures, when minimum reserve costs are determined and for calling up costing in general.
- Flexible Procedures
- The system determines the number of reporting periods from the start to the end of the transaction for the distribution of costs
- It then checks whether the "first period" requirement is fulfilled.
- Reserve Requirement Costs
- Reserve requirement costs are only calculated if there is a reserve requirement key date between the start and the end of the transaction, or if both the transaction start date and end date have not been maintained.
- Costing Call-Up
- A transaction or position is only costed if the costing period falls after the transaction start.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |