SAP ABAP Data Element JBBEKKBW (NPV of Equity Costs)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷
IS-B-DP (Application Component) Transaction Data Pool
⤷
JBD (Package) Application development IS-B Data Pool

⤷

⤷

Basic Data
Data Element | JBBEKKBW |
Short Description | NPV of Equity Costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WERTV9 | |
Data Type | CURR | Currency field, stored as DEC |
Length | 17 | |
Decimal Places | 2 | |
Output Length | 23 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | NPV of Eq. |
Medium | 20 | NPV of Equity Costs |
Long | 20 | NPV of Equity Costs |
Heading | 0 |
Documentation
Definition
The present value of equity costs is calculated by discounting the equity costs to a key date (commitment date, transaction conclusion date).
Use
The present value of the equity costs is included as an imputed costing component in the contribution margin scheme based on key dates for a single transaction. It is determined within the flexible procedures via the definition of surcharge rates specific to each bank.
History
Last changed by/on | SAP | 20011002 |
SAP Release Created in |