SAP ABAP Data Element HR_PC_CFLG (Personnel Cost Planning: Calculation active / inactive)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PA-CM-CP (Application Component) Personnel Cost Planning
⤷ PP07 (Package) Personnel Cost Planning
⤷ PA-CM-CP (Application Component) Personnel Cost Planning
⤷ PP07 (Package) Personnel Cost Planning
Basic Data
Data Element | HR_PC_CFLG |
Short Description | Personnel Cost Planning: Calculation active / inactive |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KREUZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Calculatn |
Medium | 15 | Calculation |
Long | 20 | Calculation |
Heading | 1 | A |
Documentation
Definition
In the planning tool, the system recalculates the entire scenario group whenever you make any changes. In order to improve performance, you can now switch off this calculation feature. This means that you can make changes quickly. Whilst the calculation feature is switched off, the system does not update the costs assigned to the objects.
To update the values, you can either:
- Reactivate the calculation feature using the corresponding menu option. Note: this could also cause long run times.
- First save the scenario and exit the planning tool. You can then use the report RHPP25C0 to recalculate the scenario in the background.
Note
You cannot switch off the calculation feature for scenario groups that have already been released.
History
Last changed by/on | SAP | 19980218 |
SAP Release Created in |