SAP ABAP Data Element FLAG2 (Indicator if actual delivery date is before expected date)
Hierarchy
☛
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
⤷ PT (Application Component) Personnel Time Management
⤷ PTIM (Package) HR Time Management Application Development
⤷ PT (Application Component) Personnel Time Management
⤷ PTIM (Package) HR Time Management Application Development
Basic Data
Data Element | FLAG2 |
Short Description | Indicator if actual delivery date is before expected date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Ind. 2 |
Medium | 15 | Indicator 2 |
Long | 20 | Indicator 2 |
Heading | 2 | I2 |
Documentation
Definition
You can use this indicator to control the recalculation of absences if the actual delivery date was earlier than expected.
Use
- BLANK: The absence should be shortened. All validations are based on the actual delivery date.
- 1 : The absence should remain as it is, based on the expected delivery date. The maximum period after delivery may not be exceeded, however.
The validation of the maximum end date of the absence is based in the actual delivery date, the validation of the minimum end date on the expected date of delivery. - 2: The absence is not recalculated.
The validation is based on the expected date of delivery.
Country-specific enhancements for Germany (country modifier 01):
- A: In the event of a recalculation, the defaults values are the start and end dates based on the presumed date of delivery.
The permitted values for the start date are between the earliest and latest dates for the presumed date of delivery.
The permitted valudes for the end date are between the earliest and latest dates after the presumed date of delivery. - B: Like 'A', but the lower limit for the permitted end date of the absence is based on the actual date of delivery. This is important for all types of birth for which an early end of the absence is permitted, such as all stillbirths.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19950403 |
SAP Release Created in |