SAP ABAP Data Element FILOFFMT_PS (Postponement of a Period (Months))
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷ IS-PS-CA (Application Component) Public Sector Contract Accounting
⤷ FMCAD (Package) PSCD: Basics & Documents
⤷ IS-PS-CA (Application Component) Public Sector Contract Accounting
⤷ FMCAD (Package) PSCD: Basics & Documents
Basic Data
Data Element | FILOFFMT_PS |
Short Description | Postponement of a Period (Months) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | OFFMONTH_PS | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Postp. (M) |
Medium | 15 | Postponement |
Long | 24 | Postponement period (M) |
Heading | 6 | Pstp.M |
Documentation
Definition
Use
Stipulates that the calculation period for the specified period is postponed by the given number of months.
Dependencies
Example
Your business partner has a postponed correspondence interval. The forecast period 1999 begins on 01.04.99 and ends on 31.03.00. For a contract object, a correspondence request is due at the end of the forecast period.
For this, select Annual as the interval and enter 3 (months) as the postponement period.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 462 |