SAP ABAP Data Element FILOFFMT_PS (Postponement of a Period (Months))
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷
IS-PS-CA (Application Component) Public Sector Contract Accounting
⤷
FMCAD (Package) PSCD: Basics & Documents
⤷
⤷
Basic Data
| Data Element | FILOFFMT_PS |
| Short Description | Postponement of a Period (Months) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | OFFMONTH_PS | |
| Data Type | NUMC | Character string with only digits |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Postp. (M) |
| Medium | 15 | Postponement |
| Long | 24 | Postponement period (M) |
| Heading | 6 | Pstp.M |
Documentation
Definition
Use
Stipulates that the calculation period for the specified period is postponed by the given number of months.
Dependencies
Example
Your business partner has a postponed correspondence interval. The forecast period 1999 begins on 01.04.99 and ends on 31.03.00. For a contract object, a correspondence request is due at the end of the forecast period.
For this, select Annual as the interval and enter 3 (months) as the postponement period.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in | 462 |