SAP ABAP Data Element ENDTYPE_SC (Payment Plans: End Type for a Payment Plan Item)
Hierarchy
☛
INSURANCE (Software Component) SAP Insurance
⤷ FS-CD (Application Component) Collections/Disbursements
⤷ VVSC (Package) FS-CD: Scheduling
⤷ FS-CD (Application Component) Collections/Disbursements
⤷ VVSC (Package) FS-CD: Scheduling
Basic Data
Data Element | ENDTYPE_SC |
Short Description | Payment Plans: End Type for a Payment Plan Item |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ENDTYPE_SC | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ENDTYPE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | End Type |
Medium | 15 | Type of Ending |
Long | 20 | Type of Ending |
Heading | 2 | ET |
Documentation
Definition
When ending a payment plan item early, this determines how the system is to process additional postings:
SPACE
: The total required amount is transferred. The difference between the required amount and the previously posted amounts is due on the end date.- D: The difference amount is transferred. The difference amount is also posted on the end date.
Use
Dependencies
The field does not influence the processing of charges.
Example
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 472 |