Hierarchy
⤷ PPM-PRO-RES (Application Component) Resources
⤷ DEVELOPMENT_PROJECTS_TEAM (Package) Project Management - Team/Participants/Roles
Basic Data
Data Element | DPR_TV_RELATED_COST_BREAKDOWN |
Short Description | Distribution of Costs Acc. to Distr. of Eff./Demand Possible |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ENABLE_BREAKDOWN | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Distr. |
Medium | 15 | Distr. of Costs |
Long | 20 | Cost Distribution |
Heading | 10 | Distr. |
Documentation
Definition
Specifies whether the distribution of the total demand of the role and the distribution of the assigned effort should be taken into account according to periods during costing.
The system then calculates and reports the costs and revenues during costing according to periods, taking into account the corresponding distribution value of the period.
Use
If the checkbox is deselected (default setting) the system does not take the specified distribution of the total demand and the distribution of the assigned effort into account. Costing then only knows the total demand of the role or assigned effort in relation to the validity period of this role or staffing.
Dependencies
The checkbox can only be selected if the total demand of the role and the assigned effort can be distributed over periods (week and months).
Example
History
Last changed by/on | SAP | 20141109 |
SAP Release Created in | 450 |