SAP ABAP Data Element CMS_RE_DTE_DEDUCT_CST_PCT (Allowable Cost In Percentage)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ FS-CMS-MD-RE (Application Component) Real Estate
⤷ CMS_RE (Package) Collateral Management System: Real Esate
⤷ FS-CMS-MD-RE (Application Component) Real Estate
⤷ CMS_RE (Package) Collateral Management System: Real Esate
Basic Data
Data Element | CMS_RE_DTE_DEDUCT_CST_PCT |
Short Description | Allowable Cost In Percentage |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMS_RE_PCT | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 10 | |
Decimal Places | 6 | |
Output Length | 12 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ALLOWABLE COST IN PERCENTAGE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DedCst(%) |
Medium | 15 | AlwableCst (%) |
Long | 20 | Allowable Cst (%) |
Heading | 14 | AlwableCst(%) |
Documentation
Definition
Specifies the percentage of the actual cost amount that accounts for the increase in costs.
Use
The allowable cost percentage value is used internally to calculate the allowable cost amount. This calculation is performed internally and shown as the allowable cost amount.
Note : The allowable costs account for the increasing expenses which impact costs of a specified cost type.
Dependencies
The base unit of measure that you specify for a cost type is not considered in the determination of allowable costs.
Example
For example, in the scenario of modernization and renovation measures, you can use allowable costs to account for inventory costs.
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in | 500 |