SAP ABAP Data Element CMS_RE_DTE_DEDUCT_CST_AMT (Allowable Cost Amount)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ FS-CMS-MD-RE (Application Component) Real Estate
⤷ CMS_RE (Package) Collateral Management System: Real Esate
⤷ FS-CMS-MD-RE (Application Component) Real Estate
⤷ CMS_RE (Package) Collateral Management System: Real Esate
Basic Data
Data Element | CMS_RE_DTE_DEDUCT_CST_AMT |
Short Description | Allowable Cost Amount |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMS_RE_AMOUNT | |
Data Type | CURR | Currency field, stored as DEC |
Length | 17 | |
Decimal Places | 2 | |
Output Length | 22 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ALLOWABLE COST AMOUNT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | AlwCstAmt |
Medium | 15 | AllwableCst Amt |
Long | 20 | Allowable Cst Amt |
Heading | 22 | Allowable Cst Amt |
Documentation
Definition
Specifies the amount that is determined, to account for increase in the value of a specified cost.
Use
If you set the identification for allowable costs to Yes, then the specified percentage is calculated on the actual cost amount and the result amount is indicated as allowable cost.
Dependencies
The base unit of measure of a specified cost is not considered in the calculation of the allowable cost amount.
You cannot enter the allowable cost amount. You must specify the allowable cost percentage value which is then applied on the actual cost amount, to determine the allowable cost amount.
Example
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in | 500 |