SAP ABAP Data Element CMS_DTE_PCN_PROC_CKY_AST (Process Control Key for Asset Type)
Hierarchy
☛
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
⤷ FS-CMS-MD (Application Component) Master Data
⤷ CMS_CORE_PROCESS (Package) Process Control for Core
⤷ FS-CMS-MD (Application Component) Master Data
⤷ CMS_CORE_PROCESS (Package) Process Control for Core
Basic Data
Data Element | CMS_DTE_PCN_PROC_CKY_AST |
Short Description | Process Control Key for Asset Type |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CMS_PCN_PROC_CKY | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table | TCMS_PCN_CKY |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PROC_CKY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Asset Type |
Medium | 15 | Asset Type |
Long | 20 | Asset Type |
Heading | 10 | Asset Type |
Documentation
Definition
Specifies the process control key to which asset type of the asset is assigned.
The process control key together with the process control area determines the business activities that can be performed on an asset. You must assign asset types to process control keys in the Implementation Guide (IMG) activity Assign Process Control Keys to Asset Types.
History
Last changed by/on | SAP | 20040819 |
SAP Release Created in | 200 |