SAP ABAP Data Element CMAC_XCOURSEDDS (Derive Due Date Schedule from Module or Event Package)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷ IS-HER-CM-AC (Application Component) Student Accounting
⤷ CMAC_D (Package) Campus Management: Student Account
⤷ IS-HER-CM-AC (Application Component) Student Accounting
⤷ CMAC_D (Package) Campus Management: Student Account
Basic Data
Data Element | CMAC_XCOURSEDDS |
Short Description | Derive Due Date Schedule from Module or Event Package |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DDS M/EP |
Medium | 15 | DDS f. M/EP |
Long | 20 | DDS f. Mod./E.Pkg |
Heading | 10 | DDS M/EP |
Documentation
Definition
Determines whether the system should derive the due date schedule from the module or event package.
Procedure
If you set the indicator, the system checks if a due date schedule is assigned to the module or event package.
- If a due date schedule is assigned to the event package, the system uses this due date schedule. This also applies if both the event package and the module are assigned a due date schedule.
- If only the module is assigned a due date schedule, the system uses this schedule.
- If neither the event package nor the module is assigned a due date schedule, the system uses the due date schedule of the contract object. If no due date schedule is assigned to the contract object, the system uses the due date schedule of the contract account.
If you do not set the indicator, the system can derive the due date schedule in different ways. For a list of possible derivations, see the IMG activity Derive Due Date Schedule from Program or Module/Event Package.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 463 |