SAP ABAP Data Element CMAC_PRIORITY (Priority)
Hierarchy
☛
IS-PS-CA (Software Component) IS-PUBLIC SECTOR CONTRACT ACCOUNTING
⤷ IS-HER-CM-AC (Application Component) Student Accounting
⤷ CMACGM_D (Package) Campus Management: Grant Master und Grant Evaluation
⤷ IS-HER-CM-AC (Application Component) Student Accounting
⤷ CMACGM_D (Package) Campus Management: Grant Master und Grant Evaluation
Basic Data
Data Element | CMAC_PRIORITY |
Short Description | Priority |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM03 | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Priority |
Medium | 15 | Priority |
Long | 20 | Priority |
Heading | 4 | Prio |
Documentation
Definition
Order of precedence for distribution of a grant among
- contract object types (COT) within a COT grouping
- COT groupings within an appropriation
Use
If a grant does not cover all of a student's costs or fees, the system allocates the grant in the order defined by the assigned priority.
Example
A student's total fees amount to 1000 euros. The student receives a grant of 700 euros.
Fee priority Fee amount Grant amount
1 - Tuition 550 EUR 550 EUR
2 - Books 30 EUR 30 EUR
3 - Insurance 20 EUR 20 EUR
4 - Residence fees 250 EUR 100 EUR
5 - Meal plan 150 EUR
Total 1000 EUR 700 EUR
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in | 463 |