SAP ABAP Data Element CHANGE_DATE_VS (Options for Determining the Change Date)
Hierarchy
☛
INSURANCE (Software Component) SAP Insurance
⤷
FS-CD (Application Component) Collections/Disbursements
⤷
VVSC (Package) FS-CD: Scheduling
⤷
⤷
Basic Data
| Data Element | CHANGE_DATE_VS |
| Short Description | Options for Determining the Change Date |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHANGE_DATE_VS | |
| Data Type | CHAR | Character String |
| Length | 2 | |
| Decimal Places | 0 | |
| Output Length | 2 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Change |
| Medium | 15 | Change |
| Long | 20 | Change |
| Heading | 2 | C |
Documentation
Use
Describes the date on which a payment plan change is possible.
The following options are currently supported:
- Only change to next period key date
- Only change to date in the future
- Change to user-defined period key date
- Change to user-defined date
If the change falls in the past, it is possible to take the reversal rules into account for thechange to user-defined period key date and change to user-defined date options.
History
| Last changed by/on | SAP | 20050224 |
| SAP Release Created in |