SAP ABAP Data Element CHANGE_DATE_VS (Options for Determining the Change Date)
Hierarchy
☛
INSURANCE (Software Component) SAP Insurance
⤷ FS-CD (Application Component) Collections/Disbursements
⤷ VVSC (Package) FS-CD: Scheduling
⤷ FS-CD (Application Component) Collections/Disbursements
⤷ VVSC (Package) FS-CD: Scheduling
Basic Data
Data Element | CHANGE_DATE_VS |
Short Description | Options for Determining the Change Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHANGE_DATE_VS | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Change |
Medium | 15 | Change |
Long | 20 | Change |
Heading | 2 | C |
Documentation
Use
Describes the date on which a payment plan change is possible.
The following options are currently supported:
- Only change to next period key date
- Only change to date in the future
- Change to user-defined period key date
- Change to user-defined date
If the change falls in the past, it is possible to take the reversal rules into account for thechange to user-defined period key date and change to user-defined date options.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |