SAP ABAP Data Element BBP_CK_PPRDZ (Period of future cost estimate)
Hierarchy
☛
SRM_PLUS (Software Component) SRM_PLUS for mySAP SRM
⤷
SRM (Application Component) Supplier Relationship Management
⤷
BBP_MW_SIBLS (Package) BBP Equivalent Objects for CRM Objects for SRM 4.0@ERP 2004
⤷
⤷
Basic Data
| Data Element | BBP_CK_PPRDZ |
| Short Description | Period of future cost estimate |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | POPER | |
| Data Type | NUMC | Character string with only digits |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | BUP | |
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Fut. per. |
| Medium | 15 | Future period |
| Long | 20 | Future period |
| Heading | 12 | Fut. period |
History
| Last changed by/on | SAP | 20040202 |
| SAP Release Created in | 400 |